The Challenge

A new HVDC transmission line is being planned with a voltage of ±500kV and a distance of 577 km. The distance of one planned electrode from nearby constructed pipeline is about 9 km. The pipeline is likely susceptive to interference from the HVDC systems. There is a need to assess the interference level and its risk, and the feasibility of mitigation.

 

To get the full information on this case study please Download the case study below

Download Here