The Challenge

During inspection of Offshore Oil & Gas equipment it was identified that the welding had not been performed correctly and that there was incomplete root penetration. The choice of the operator was to either shut down the operation and replace the valves or to remain in operation until a convenient time for replacement could be identified. The challenge was to determine if the incomplete welds could be safely operated until they are replaced.

 

To get the full information on this case study please Download the case study below

Download Here

Request Information

Follow Us!

Newsletter Sign-up

Areas of Interest

Please note that by submitting this form you are giving us permission to store the details you have entered above in our database system.  We will use this data to add you to our mailing list to receive the monthly BEASY e-newsletters you have selected. You can remove yourself from the e-newsletter mailing list at anytime by choosing the opt-out feature on the e-newsletter. We may also send you literature about BEASY via postal mailings and any other BEASY information and announcements which we think you will find of interest. We will not pass your details on to any 3rd party organisations.